Details
Surface Preparation: All existing surfaces must
be structurally sound solid and completely clean to
include the removal of form release, existing
sealers or paints, patching compounds, weak or
loose areas, dust, dirt, oil or any other contaminant
which may act as a bond breaker. Where required
to obtain a solid surface, substrate penetration must
be by mechanical means such as sandblasting or
grinding.
Mixing Instructions: Measure accurately. Water
to be added to the mix as follows:
Add the grout to clean water, mix only as much as
can be used in 15 minutes. Water requirements are
approx. as follows (per 50lb bag): DRY PACK-3L,
PLASTIC-4.5L, FLOWABLE-5L, and FLUID-5.6L.
Water requirements will vary depending on
temperature. Gently add no more than ½ bag at a
time to the mixing container and mix thoroughly and
continuously to avoid lumps in mix. Mix only what
can be used as the final mix will set up very quickly.
Application Procedure: Use a steel trowel. Fill
form from all four sides and make sure that material
is fully packed into the open cavity of the form
Set Time: Approximately 20 minutes depending on
the temperature and humidity at time of application.
Use warm mixing water in cold temperatures to help
increase set time. If product begins to set in the
bucket, re-mix by hand or use a mixing paddle and
drill to re-temper. Do not add water!
Bucket Life: Approximately 5 minutes depending
on temperature and humidity.